Documents
Throughout the GDA process, Holtec Britain has submitted a series of documents to the regulators in support of the assessment of the SMR-300 design. The principal deliverables are the Safety, Security and Environment Case (SSEC), which is made up of the Preliminary Safety Report, Preliminary Environmental Report, and Generic Security Report.
Holtec is committed to sharing these documents on our website to provide the public with visibility of our GDA journey. While all commercially or security-sensitive information will be removed, we will make every effort to ensure as much information as possible is available.
In addition to the material published on our website, the regulators will also release information on their respective websites (see links below), both at key milestones and periodically, to report on progress in the regulatory process.
We welcome your questions on the SMR-300 design based on the information contained in the SSEC. Please use the ‘Have Your Say’ link in the navigation bar above to get in touch.
Environment Agency – New nuclear power stations: assessing reactor designs
Revision 1
- PSR Part A Chapter 1 Introduction
- PSR Part A Chapter 2 General Design Aspects and Site Characteristics
- PSR Part A Chapter 3 Claims, Arguments and Evidence
- PSR Part A Chapter 4 Lifecycle Management of Safety and Quality Assurance
- PSR Part A Chapter 5 Summary of ALARP and SSEC
- PSR Part B Chapter 1 Reactor Coolant System and Engineered Safety Features
- PSR Part B Chapter 2 Reactor
- PSR Part B Chapter 4 Control & Instrumentation
- PSR Part B Chapter 5 Reactor Supporting Facilities
- PSR Part B Chapter 6 Electrical Engineering
- PSR Part B Chapter 9 Conduct of Operations
- PSR Part B Chapter 10 Radiological Protection
- PSR Part B Chapter 11 Environmental Protection
- PSR Part B Chapter 12 Nuclear Site Health and Safety and Conventional Fire Safety
- PSR Part B Chapter 13 Radioactive Waste Management
- PSR Part B Chapter 14 Safety and Design Basis Accident Analysis
- PSR Part B Chapter 15 BDBA, Severe Accidents Analysis and Emergency Preparedness
- PSR Part B Chapter 16 Probabilistic Safety Assessment
- PSR Part B Chapter 17 Human Factors
- PSR Part B Chapter 18 Structural Integrity
- PSR Part B Chapter 19 Mechanical Engineering
- PSR Part B Chapter 20 Civil Engineering
- PSR Part B Chapter 21 External Hazards
- PSR Part B Chapter 22 Internal Hazards
- PSR Part B Chapter 23 Reactor Chemistry
- PSR Part B Chapter 24 Fuel Transport and Storage
- PSR Part B Chapter 25 Construction and Commissioning Approach
- PSR Part B Chapter 26 Decommissioning Approach
- PER Chapter 1 Radioactive Waste Management Arrangements
- PER Chapter 2 Quantification of Effluent Discharges and Limits
- PER Chapter 3 Radiological Impact Assessment
- PER Chapter 4 Conventional Impact Assessment
- PER Chapter 5 Monitoring and Sampling
- PER Chapter 6 Demonstration of BAT
- Generic Security Report
- Preliminary Safeguards Report